Displaying items by tag: doe
Report Card for U.S. Department of Energy, Oak Ridge Operations: Failing grades in stakeholder engagement and environmental decision making

Editor’s note: As reported in Hellbender Press, the Department of Energy’s Oak Ridge Office of Environmental Management (OREM) was reprimanded by the Southern Environmental Law Center for neglecting its duty to follow guidelines and proper procedures mandated by the National Environmental Policy Act (NEPA). Of immediate concern was OREM’s pretext and information — or specifically lack of pertinent information — released ahead of the public meeting on May 17, 2022 about its project for a new “Environmental Management Disposal Facility” (EMDF).
With regard to NEPA compliance, Oak Ridge Operations has been the black sheep in DOE’s stable because it never prepared the required site-wide environmental impact statement (EIS) for the Oak Ridge Reservation (ORR). At said public meeting, Virginia Dale, Corporate Fellow Emeritus of Oak Ridge National Laboratory, commented on another tangent of shortcomings — not spelled out by Federal law — but matters of common sense, competent decision making and good community spirit.
- environmental management disposal facility
- emdf
- oak ridge office of environmental management
- orem
- national environmental policy act
- nepa
- bear creek valley
- oak ridge reservation
- us department of energy
- doe
- virginia dale
- oak ridge
- national science foundation
- nsf
- stakeholder
- stakeholder engagement
- environmental decision making
- waste acceptance criteria
- wac
- bear creek
- ground water characterization
- end use working group
- tennessee water quality control act
- comprehensive environmental response, compensation and liability act
- cercla
Opponents of Oak Ridge waste dump, citing comms breakdown, urge extension of public comment period
Image from a 2018 memorandum authored by experts including former Department of Energy employees in Oak Ridge. EMWMF is the present landfill that has a history of failures and is reaching capacity. Ecologists say, after a decade DOE still is not adequately addressing waste acceptance criteria and feasible alternatives.
Public can comment in person Tuesday night in Oak Ridge on proposed DOE waste dump
OAK RIDGE — The Southern Environmental Law Center blistered the Department of Energy in a letter ahead of a May 17 hearing on construction of a toxic-waste landfill that opponents said poses contamination threats to portions of the Clinch River watershed and downstream TVA reservoirs.
The hearing is set for 6-8 p.m. Tuesday, May 17 at the Pollard Technology Conference Center, 210 Badger Ave. This email address is being protected from spambots. You need JavaScript enabled to view it. will be accepted through June 7.
The Department of Energy wants to bury contaminated debris from demolition of Manhattan Project-era complexes and associated legacy toxins from the Oak Ridge Reservation. The drawn-out debate about how best to safely store the materials now focuses on the transparency of the decision process and the health of the Bear Creek watershed and downstream pollution threats to the Clinch River.
- doe
- doe waste dump
- does oak ridge have nuclear waste
- oak ridge landfill
- oak ridge
- bear creek valley
- oak ridge reservation
- radioactive waste
- hazardous waste
- advocates for the oak ridge reservation
- southern environmental law center
- selc
- aforr
- clinch river
- tva reservoir
- soggy bottom
- environmental quality advisory board
- eqab
- public participation
- public meeting
- environmental management disposal facility
- emdf
Oak Ridge reacetrack at Horizon Center
Feb 4 7–8:30 p.m.
Why We Oppose the Proposed Oak Ridge Motorsports Complex
Virginia Dale and Ellen Smith
Advocates for the Oak Ridge Reservation (AFORR)
Zoom Meeting - Free and open to the public - RSVP
The proposed racetrack would destroy natural assets that DOE committed to protect and adversely affect recreational users and nearby residents.
Sponsored by Oak Ridgers for Responsible Development (OR4RD), Tennessee Citizens for Wilderness Planning (TCWP), and AFORR.
More details and required registration
After registering, you will receive a confirmation email containing information about joining the meeting.